Modular Shopping Mall High Rise Steel Structure Building Prefabricated Heavy Duty Equipment Steel Structure Weldment

Product Parameters

  • Project Name:

    Nanjing Deji Plaza.

  • Design Style:

    Concrete girder single tower cable-stayed bridge.

  • Installation:

    Installation Drawing or Technician On-site Guidance.

  • Certificate:

    ISO9001, ISO14001, OHSAS18001

  • Application:

    High-rise Building Steel Structure

  • Product Description
  • Video
  • Product Advantages
  • Product Application
  • Production Process
  • Packing &Delivery
  • Construction Process
  • FAQ
Inquiry

Product Description

Nanjing Deji Plaza.

Deji Plaza, located at No. 18 Zhongshan Road, Xuanwu District, Nanjing, at the northeast corner of Xinjiekou, the "No.1 Business District in China", is an integrated shopping mall positioned for high-end business. The underground part of the mall is connected to Xinjiekou Station, which is the largest subway station in Asia. The project is divided into two parts, Phase I and Phase II, covering an area of 41,244 square meters, with a total floor area of more than 300,000 square meters, and the main building of Phase II is 337.5 meters. Phase I of Deji Plaza officially opened on June 26, 2006, and Phase II opened on May 8, 2012, with more than 95% of first-tier luxury brands already in place, making it the largest luxury center in Xinjiekou.

Phase I of Deji Plaza has a commercial area of 65,000 square meters, divided into 7 floors above ground and 1 floor below ground; the main body of Phase II of Deji Plaza consists of a 62-storey main building and a podium with 8 floors above ground and 5 floors below ground. after the official completion of the docking of Phase I and Phase II on May 8, 2012, the overall area of Deji Plaza has reached 313,000 square meters, of which the shopping mall covers an area of 150,000 square meters, and the first two phases together have settled 74 international first-class brands by 2013, which is a representative building of the city center. As of 2013, 74 international first-tier brands have been installed in Phase I and II, making it a representative building in the city center that integrates a top-class shopping mall, Grade A offices and high-end hotels.

Phase II of Deji Plaza (1-minute walk to Xinjiekou Metro Station), located at No. 18 Zhongshan Road, with Sugar Square Bridge in the east, Zhongshan Road in the south, Zhongshan Road in the west, and Yangtze River Road in the north, is a Shopping Mall integrating store-style shopping malls and serviced apartments.Phase I of Deji Plaza is a shopping mall with a total area of 64,000 square meters, and Phase II with a total area of 160,000 square meters is made up of a 9-story podium and a 48-story, 240-meter-high main building. meter high main building. The commercial area of the podium is 85,000 square meters, and the business mode is designed as stores, theme stores, food plaza, entertainment facilities, etc.; the main building integrates high-grade serviced apartments and business offices. The developer is Nanjing Xinyu Real Estate Development Co., Ltd, which is subordinate to Jiangsu Deji Group Co., Ltd. The properties developed by Deji Group include Deji - Zijinshanzhuang (Huanling Road, with a total construction of 8,100 square meters), Deji Mansion (No. 188, Changjiang Road, with a total construction of 49,268 square meters), and Deji - Zijin Nanyuan (Changxiang Lane, with a total construction of 250,000 square meters).

Construction Process Introduction:

Construction Process

Nanjing Deji Plaza Phase II podium 9 roof glass canopy plane for the irregular quadrilateral, north-south length of 81m, east-west width of 36m roof area of 1945.85m, the steel structure using prestressed cable frame system, the maximum span of 36m height of the highest point of 9.66m, by the top of the 8 for the prestressed cable dialysis frame and the north and south ends of the single tube beams and peripheral beams, the elevation for the steel structure columns The façade is supported by steel columns, and the main rods are Q345B hot-rolled seamless steel pipes, with a steel consumption of 110.99t.

Construction Process

The roof, south elevation, west elevation and north elevation of the canopy project are glass curtain wall, and the east elevation is aluminum veneer curtain wall. The maximum size of the glass specification is 4651mmx1248mm, of which the roof glass area is 2000m% and the glass of the façade is mostly shaped specification. The east elevation is a large-scale aluminum alloy louver in the middle of the thermal insulation layer outside the 3mm-thick aluminum veneer curtain wall surface with white fluorocarbon spray coating area of 372m2.

Steel structure construction sequence:

large-scale aluminum

Installation of column base → installation of column → assembly of cable truss → hoisting of cable truss → spraying of fireproof coating → painting of silicone resin isolating agent → fluorocarbon putty patching → spraying of surface fluorocarbon paint

Video

Product Advantages

  • * Honglu, a steel structure top manufacturer with daily capacity 15,000+Tons, Effectively Shorten Construction Period And Saving Construction Costs For You.
    * 10 Production Sites, 400+ Production Lines, Annual Production Capacity Of Steel Structure 5,000,000+ Tons, Slabs 30,000,000+m2.
    * Experiencing 21 Years, Serving 100,000+ Customers,Take The Lead In Passing ISO9001, ISO14001, OHSAS18001, Certification of European& American Standards.
    * Rich Product Chains, One-Stop Service For Steel Structure Projects

Product Application

Production Process

                        Fabrication of Lifting Frame                    Assembly And Tack Welding Of Stiffened Plate

                     Assembly Welding of Bracket                           Assembly Welding of Clapboard

With rich experience in bridge fabrication and installation, Honglu has carried out effective on-site control from the aspects of plate straightening, hole making, assembly and welding, etc...and the factory pre-assembly of bridge sections to ensure the high installation accuracy of steel members during construction.

 

Strictly On-site Construction Technology

Excellent engineering management teams, carry out on-site construction in strict accordance with the approved special construction scheme and operating procedures, ensure that all projects achieve the goal of high quality, high efficiency, low consumption, timely, safely and civilly.

 

Our company, Honglu Steel Structure Group is one of largest steel structure manufacturers in China. We own experienced design engineers. advanced automatic welding machines. strict quality control system, best after service for steel structure.

Ne could desgn, fabricate, supply and construct all kinds of steel structure projects allover the world. Such as Light & Heavy Steel Workshop or Warehouse. Steel Space Frame, Steel Truss. Market building, Stadium. Shopping Mall, Roof & Wall Plates. etc

Packing &Delivery

 

Construction Process

FAQ

  • Q:

    Are you original manufacturer or trading company?

    A:

    We are original steel structure top manufacturer with daily capacity 15000 Tons. In order to know more of us professionalism and get the best competitive price, please contact the Sales Team to visit our factory.

  • Q:

    Is your price competitive compared with other companies?

    A:

    Our objectives are to give the best price with same quality and the best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.

  • Q:

    Can you send engineers or whole team to install my project?

    A:

    We will send detailed installation drawings for free. Or send engineers as installation director or a team upon request.

  • Q:

    Do you accept container loading inspection?

    A:

    Yes, you are welcome to send an inspector, not only for the container loading, but any time during the production time.

  • Q:

    What’s your work flow?

    A:

    Send us Steel Structure Drawing for quotation-Sign contract-Drawings Deepening and Task Decomposition-Production planning and task decomposition-Product outbound and shipping-Project sealing in archives

SEND US A MESSAGE

If you have any questions, please leave a message,we will reply as soon as possible.

Company Advantages

Honglu Group, mainly focuses on the manufacturing of high-quality steel structure and the R&D of prefabricated technology.

  • Steel structure manufacturer

    Honglu, a steel structure top manufacturer with daily capacity 15,000+Tons, Effectively Shorten Construction Period And Saving Construction Costs For You.

  • efficient production

    10 Production Sites, 400+ Production Lines, Annual Production Capacity Of Steel Structure 5,000,000+ Tons, Slabs 30,000,000㎡.

  • High quality service

    Experiencing 21 Years, Serving 100,000+ Customers,Take The Lead In Passing ISO9001, ISO14001, OHSAS18001,Certification of European& American Standards.

  • Rich product chain

    Rich Product Chains, One-Stop Service For Steel Structure Projects.

Certifications

  • ISO14001

  • ISO9001

  • OHSAS18001

  • Steel-Structure-Manufacturing-Certificate-(Special-Level)

  • National-Recognized-R&D-Center

  • National-Prefabricated-Construction-Base

On-line Factory Inspection

In order to arrange On-line Factory Inspection timely, please fill in the above information in detail, thank you.