• Steel frame support structure
  • Steel plate
  • 天文时空塔 工程概况: 天文时空塔项目位于贵州省黔南州平塘县航龙村,世界上口径最大、最县威力的单天线射电望远镜--500米口径球面射电望远FAST坐落于此,作为“天眼景区”配套项目之一的天文时空塔,项目总投资约2亿元,建筑占地面积约621平方米,总建筑面积约3615平方米。建设塔高99.99米,塔基半径约23米,塔座第一级5米,第二级18米,天文时空塔地面外筒直径18米,塔身15米处有10米县挑平台,80米处有8米县挑平台,塔顶为19.99米的等天射灯,是天文小镇标志性建筑。该塔还有县挑平台、3D观影银幕、VR展厅等,塔顶还可以设置室内观光厅、蹦极、滑翔等极限运动。 施工工艺简介: 鸿路钢构承建该项目的制作与安装,塔身地上27层,地下1层,项目采用钢框架+支撑结构,且结构形式主要为圆管柱环状排布,观光平台锥型结构,项目工期紧、要求高,制作难度大。钢板最大板厚40mm,材质为Q345B,钢柱焊接,全熔透悍接量大,钢柱焊接后的变形、收缩等等都给加工焊接带来一定难度,柱身上连接梁、支撑牛腿、相贯线支管设置较多,牛腿、支管连接空间角度尺寸装配难度大,且装配角度、尺寸误差都会给后续现场安装带来不便,公司在加工前便与工厂技术、施工人员进行技术交底、制定加工工艺方案等确保构件焊接质量满足工程设计要求。 Astronomical Spacetime Tower Engineering Overview: Astronomical Space and Time Tower project is located in Hanglong Village, Pingtang County, Qiannan Prefecture, Guizhou Province, the world's largest calibre, the most powerful single-antenna radio telescope - 500-meter aperture spherical radio telescope FAST is located here, as the
  • 天文时空塔 工程概况: 天文时空塔项目位于贵州省黔南州平塘县航龙村,世界上口径最大、最县威力的单天线射电望远镜--500米口径球面射电望远FAST坐落于此,作为“天眼景区”配套项目之一的天文时空塔,项目总投资约2亿元,建筑占地面积约621平方米,总建筑面积约3615平方米。建设塔高99.99米,塔基半径约23米,塔座第一级5米,第二级18米,天文时空塔地面外筒直径18米,塔身15米处有10米县挑平台,80米处有8米县挑平台,塔顶为19.99米的等天射灯,是天文小镇标志性建筑。该塔还有县挑平台、3D观影银幕、VR展厅等,塔顶还可以设置室内观光厅、蹦极、滑翔等极限运动。 施工工艺简介: 鸿路钢构承建该项目的制作与安装,塔身地上27层,地下1层,项目采用钢框架+支撑结构,且结构形式主要为圆管柱环状排布,观光平台锥型结构,项目工期紧、要求高,制作难度大。钢板最大板厚40mm,材质为Q345B,钢柱焊接,全熔透悍接量大,钢柱焊接后的变形、收缩等等都给加工焊接带来一定难度,柱身上连接梁、支撑牛腿、相贯线支管设置较多,牛腿、支管连接空间角度尺寸装配难度大,且装配角度、尺寸误差都会给后续现场安装带来不便,公司在加工前便与工厂技术、施工人员进行技术交底、制定加工工艺方案等确保构件焊接质量满足工程设计要求。 Astronomical Spacetime Tower Engineering Overview: Astronomical Space and Time Tower project is located in Hanglong Village, Pingtang County, Qiannan Prefecture, Guizhou Province, the world's largest calibre, the most powerful single-antenna radio telescope - 500-meter aperture spherical radio telescope FAST is located here, as the

Chinese Guizhou high-rise steel structure project Astronomical Time Tower sightseeing platform conical structure building

Product Parameters

  • Project Name:

    Lanzhou Red House Times Square.

  • Design Style:

    The main body of the project is designed to consist of a podium and a super high-rise tower.

  • Installation:

    Installation Drawing or Technician On-site Guidance.

  • Certificate:

    ISO9001, ISO14001, OHSAS18001

  • Application:

    High-rise Building Steel Structure

  • Product Description
  • Video
  • Product Advantages
  • Product Application
  • Production Process
  • Packing &Delivery
  • Construction Process
  • FAQ
Inquiry

Product Description

Astronomical Spacetime Tower

Engineering Overview:

Astronomical Space and Time Tower project is located in Hanglong Village, Pingtang County, Qiannan Prefecture, Guizhou Province, the world's largest calibre, the most powerful single-antenna radio telescope - 500-meter aperture spherical radio telescope FAST is located here, as the "Eye of the Sky Scenic Area" one of the supporting projects of the Astronomical Space and Time Tower, the project's total investment of about 200 million yuan, the building occupies a total land area of about The total investment of the project is about 200 million yuan, the building covers an area of about 621 square meters, with a total construction area of about 3615 square meters. Construction tower height of 99.99 meters, tower base radius of about 23 meters, the tower base of the first level of 5 meters, the second level of 18 meters, astronomical time and space tower ground cylinder diameter of 18 meters, the tower 15 meters at the 10-meter county picking platform, 80 meters at the 8-meter county picking platform, the top of the tower for the 19.99-meter isotropic spotlight, is the astronomical town of the iconic building. The tower also has a county picking platform, 3D viewing screen, VR exhibition hall, etc. The top of the tower can also be set up indoor sightseeing hall, bungee jumping, gliding and other extreme sports.

Construction Process Introduction:

Honglu steel structure to undertake the production and installation of the project, the tower body of 27 floors above ground, 1 floor underground, the project adopts the steel frame + support structure, and the structural form of the circular tube columns mainly for the circular rows, sightseeing platform cone structure, the project schedule is tight, high requirements, production difficulties. Maximum plate thickness of 40mm, the material is Q345B, steel column welding, full fusion through the Hum joints, the deformation of the steel column after welding, shrinkage, etc. have brought certain difficulties to the processing and welding, the column body connection beams, support bull legs, through the line of the branch pipe set up more, the bull legs, branch pipe connected to the space angle dimensions of the assembly is difficult, and the assembly angle, the size of the error will be to the subsequent site installation will bring about inconvenience, the company in the processing of the former Before processing, the company will carry out technical briefing with the factory technology and construction personnel, and formulate the processing technology programme to ensure that the welding quality of the components meets the requirements of the project design.

Video

Product Advantages

  • * Honglu, a steel structure top manufacturer with daily capacity 15,000+Tons, Effectively Shorten Construction Period And Saving Construction Costs For You.
    * 10 Production Sites, 400+ Production Lines, Annual Production Capacity Of Steel Structure 5,000,000+ Tons, Slabs 30,000,000+m2.
    * Experiencing 21 Years, Serving 100,000+ Customers,Take The Lead In Passing ISO9001, ISO14001, OHSAS18001, Certification of European& American Standards.
    * Rich Product Chains, One-Stop Service For Steel Structure Projects

Product Application

Production Process

                                     Fabrication of Lifting Frame                          Assembly And Tack Welding Of Stiffened Plate

                                       Assembly Welding of Bracket                              Assembly Welding of Clapboard

With rich experience in bridge fabrication and installation, Honglu has carried out effective on-site control from the aspects of plate straightening, hole making, assembly and welding, etc...and the factory pre-assembly of bridge sections to ensure the high installation accuracy of steel members during construction.

 

Strictly On-site Construction Technology

Excellent engineering management teams, carry out on-site construction in strict accordance with the approved special construction scheme and operating procedures, ensure that all projects achieve the goal of high quality, high efficiency, low consumption, timely, safely and civilly.

 Our company, Honglu Steel Structure Group is one of largest steel structure manufacturers in China. We own experienced design engineers. advanced automatic welding machines. strict quality control system, best after service for steel structure.

Ne could design, fabricate, supply and construct all kinds of steel structure projects allover the world. Such as Light & Heavy Steel Workshop or Warehouse. Steel Space Frame, Steel Truss. Market building, Stadium. Shopping Mall, Roof & Wall Plates. etc

Packing &Delivery

 

Construction Process

FAQ

  • Q:

    Are you original manufacturer or trading company?

    A:

    We are original steel structure top manufacturer with daily capacity 15000 Tons. In order to know more of us professionalism and get the best competitive price, please contact the Sales Team to visit our factory.

  • Q:

    Is your price competitive compared with other companies?

    A:

    Our objectives are to give the best price with same quality and the best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.

  • Q:

    Can you send engineers or whole team to install my project?

    A:

    We will send detailed installation drawings for free. Or send engineers as installation director or a team upon request.

  • Q:

    Do you accept container loading inspection?

    A:

    Yes, you are welcome to send an inspector, not only for the container loading, but any time during the production time.

  • Q:

    What’s your work flow?

    A:

    Send us Steel Structure Drawing for quotation-Sign contract-Drawings Deepening and Task Decomposition-Production planning and task decomposition-Product outbound and shipping-Project sealing in archives

SEND US A MESSAGE

If you have any questions, please leave a message,we will reply as soon as possible.

Company Advantages

Honglu Group, mainly focuses on the manufacturing of high-quality steel structure and the R&D of prefabricated technology.

  • Steel structure manufacturer

    Honglu, a steel structure top manufacturer with daily capacity 15,000+Tons, Effectively Shorten Construction Period And Saving Construction Costs For You.

  • efficient production

    10 Production Sites, 400+ Production Lines, Annual Production Capacity Of Steel Structure 5,000,000+ Tons, Slabs 30,000,000㎡.

  • High quality service

    Experiencing 21 Years, Serving 100,000+ Customers,Take The Lead In Passing ISO9001, ISO14001, OHSAS18001,Certification of European& American Standards.

  • Rich product chain

    Rich Product Chains, One-Stop Service For Steel Structure Projects.

Certifications

  • ISO14001

  • ISO9001

  • OHSAS18001

  • Steel-Structure-Manufacturing-Certificate-(Special-Level)

  • National-Recognized-R&D-Center

  • National-Prefabricated-Construction-Base

On-line Factory Inspection

In order to arrange On-line Factory Inspection timely, please fill in the above information in detail, thank you.