• Structural Steel Prefab Building
  • Steel Structure
  • Drawing Steel Structure

High Rise Square Building With Modern Steel Structure Design Heavy Metal Building Prefabricated Steel Structure

Product Parameters

  • Project Name:

    Lanzhou Red House Times Square.

  • Design Style:

    The main body of the project is designed to consist of a podium and a super high-rise tower.

  • Installation:

    Installation Drawing or Technician On-site Guidance.

  • Certificate:

    ISO9001, ISO14001, OHSAS18001

  • Application:

    High-rise Building Steel Structure

  • Product Description
  • Video
  • Product Advantages
  • Product Application
  • Production Process
  • Packing &Delivery
  • Construction Process
  • FAQ
Inquiry

Product Description

Lanzhou Red House Times Square.

Steel Prefab Building

Lanzhou Red House Times Square is located in Lanzhou City, Gansu Province, the project is located in the southeast corner of Nanguan Shizi, Chengguan District, Lanzhou City, located in the heart of the city. Total construction area of about 138,000 square meters, building height of more than 200m, is a super-high-rise integration of urban commercial complex, is a landmark building in Lanzhou City, the main body of the project is designed for the podium and super-high-rise towers composed of a total area of about 10,000 square meters of land, a total construction area of about 138,000 square meters, the total construction area above ground is 116,000 square meters, and the total construction area below ground is about 22,000 square meters. The height of the main body of the Red Tower Times Square building is 246.2 meters, and the total height of the building is 266 meters, which is ranked 89th in the nation's super-high-rise buildings. The Lanzhou Red Tower Times Square project has a total of 3 underground floors, which are mainly used for the garage and the equipment room; and the tower has a total of 56 floors above the ground level, which are used for the shopping malls, hotels, offices, etc., and the top floor is equipped with a tarmac. The completed five-star deluxe hotel has 476 sets of standard rooms and 8 sets of presidential rooms. The total construction period is about 3 to 5 years, and the total investment scale is more than 1 billion RMB. After the completion of the Times Square, will be internationalized large-scale shopping malls, five-star luxury hotels, high-grade office buildings, distinguished private clubs and other integrated urban business complex of a new look, appeared in the core business district of Lanzhou, according to which, to create a Lanzhou and even the northwest region of the city's landmarks. And it fills the blank of ultra-high-rise buildings in the northwest of China.

Construction Process Introduction:

The project is built with all-glass curtain wall, Total steel consumption of about 19,000 tons,and the main structure adopts rectangular steel pipe concrete core steel beam-steel core cylinder structural system. Through comparative analysis, a double-layer reinforcement layer is set up between the podium and the tower, and the extension trusses and waist trusses are all supported by steel frames; the head of the building body uses rhombic all-glass curtain wall in the area of triangular large cut surface, which differentiates the building body from the unit-type curtain wall structure, and echoes the effect of the podium.

Video

Product Advantages

  • * Honglu, a steel structure top manufacturer with daily capacity 15,000+Tons, Effectively Shorten Construction Period And Saving Construction Costs For You.
    * 10 Production Sites, 400+ Production Lines, Annual Production Capacity Of Steel Structure 5,000,000+ Tons, Slabs 30,000,000+m2.
    * Experiencing 21 Years, Serving 100,000+ Customers,Take The Lead In Passing ISO9001, ISO14001, OHSAS18001, Certification of European& American Standards.
    * Rich Product Chains, One-Stop Service For Steel Structure Projects

Product Application

Production Process

               Fabrication of Lifting Frame                          Assembly And Tack Welding Of Stiffened Plate

                Assembly Welding of Bracket                              Assembly Welding of Clapboard

With rich experience in bridge fabrication and installation, Honglu has carried out effective on-site control from the aspects of plate straightening, hole making, assembly and welding, etc...and the factory pre-assembly of bridge sections to ensure the high installation accuracy of steel members during construction.

 

Strictly On-site Construction Technology

Excellent engineering management teams, carry out on-site construction in strict accordance with the approved special construction scheme and operating procedures, ensure that all projects achieve the goal of high quality, high efficiency, low consumption, timely, safely and civilly.

 Our company, Honglu Steel Structure Group is one of largest steel structure manufacturers in China. We own experienced design engineers. advanced automatic welding machines. strict quality control system, best after service for steel structure.

Ne could design, fabricate, supply and construct all kinds of steel structure projects allover the world. Such as Light & Heavy Steel Workshop or Warehouse. Steel Space Frame, Steel Truss. Market building, Stadium. Shopping Mall, Roof & Wall Plates. etc

Packing &Delivery

 

Construction Process

FAQ

  • Q:

    Are you original manufacturer or trading company?

    A:

    We are original steel structure top manufacturer with daily capacity 15000 Tons. In order to know more of us professionalism and get the best competitive price, please contact the Sales Team to visit our factory.

  • Q:

    Is your price competitive compared with other companies?

    A:

    Our objectives are to give the best price with same quality and the best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.

  • Q:

    Can you send engineers or whole team to install my project?

    A:

    We will send detailed installation drawings for free. Or send engineers as installation director or a team upon request.

  • Q:

    Do you accept container loading inspection?

    A:

    Yes, you are welcome to send an inspector, not only for the container loading, but any time during the production time.

  • Q:

    What’s your work flow?

    A:

    Send us Steel Structure Drawing for quotation-Sign contract-Drawings Deepening and Task Decomposition-Production planning and task decomposition-Product outbound and shipping-Project sealing in archives

SEND US A MESSAGE

If you have any questions, please leave a message,we will reply as soon as possible.

Company Advantages

Honglu Group, mainly focuses on the manufacturing of high-quality steel structure and the R&D of prefabricated technology.

  • Steel structure manufacturer

    Honglu, a steel structure top manufacturer with daily capacity 15,000+Tons, Effectively Shorten Construction Period And Saving Construction Costs For You.

  • efficient production

    10 Production Sites, 400+ Production Lines, Annual Production Capacity Of Steel Structure 5,000,000+ Tons, Slabs 30,000,000㎡.

  • High quality service

    Experiencing 21 Years, Serving 100,000+ Customers,Take The Lead In Passing ISO9001, ISO14001, OHSAS18001,Certification of European& American Standards.

  • Rich product chain

    Rich Product Chains, One-Stop Service For Steel Structure Projects.

Certifications

  • ISO14001

  • ISO9001

  • OHSAS18001

  • Steel-Structure-Manufacturing-Certificate-(Special-Level)

  • National-Recognized-R&D-Center

  • National-Prefabricated-Construction-Base

On-line Factory Inspection

In order to arrange On-line Factory Inspection timely, please fill in the above information in detail, thank you.