• Steel frame support structure
  • ongling Eastern District Integrated Activity Centre
  • Engineering Overview

Large-span aerial steel multi-storey truss structure urban comprehensive activity centre

Product Parameters

  • Project Name:

    Lanzhou Red House Times Square.

  • Design Style:

    The main body of the project is designed to consist of a podium and a super high-rise tower.

  • Installation:

    Installation Drawing or Technician On-site Guidance.

  • Certificate:

    ISO9001, ISO14001, OHSAS18001

  • Application:

    High-rise Building Steel Structure

  • Product Description
  • Video
  • Product Advantages
  • Product Application
  • Production Process
  • Packing &Delivery
  • Construction Process
  • FAQ
Inquiry

Product Description

Tongling Eastern District Integrated Activity Centre

Engineering Overview:

Anhui Province Tongling East City Comprehensive Activity Centre is located in the west end of the core area of Tongling East New Town, with the back of the mountain and the lake. The height of the building is 48.6m, with one floor underground and eleven floors above ground. The plane is three sides of the enclosing door-shaped, by 2 seismic joints will be part of the upper part of the three independent towers West tower plan position in the centre, the facade early door-shaped, north-south length 88.6m, east-west width 17.0m, the width of the two sides of the landing of each 17.4m. Since the 8th floor from the formation of a continuous floor until the roof, the west building of the main processing components of the gallery, steel columns, beams, trusses, steel bracing, corner bracing, floor bearing plate edge of the feeler plate, etc., the material is Q345GJ, and the building is made of Q345GJ. The materials are Q345GJC, Q345C, Q3458, Q2358, the total steel consumption is about 3,500 tonnes, and the first factory of Honglu Steel Structure is responsible for the processing and production of steel components.

The project requires high quality of weld, welded box section steel columns in the frame beam beam height and its upper and lower 600mm nodes within the scope of the column wall plate between the weld and welded box load surface, H section steel columns joints and other locations of the factory are used to open the bevel of the full penetration of the first level of the weld. In addition, because of the box-type forest plate thickness of 40-50mm, welding is difficult, the factory to strengthen the process of research, to determine a reasonable welding sequence, to ensure the quality of the seam. After the welding is completed, the factory adopts special section milling tools to carry out end milling on the box-type columns, and the surface of the box-type columns after end milling is smooth, and the end surface is bright and beautiful, which ensures the smooth installation of the components.

The north and south buildings of the project adopt reinforced concrete frame structure, the west building adopts steel frame support structure, the large-span connecting part adopts truss structure, and the floor system is a combination of pressurised steel plate and concrete floor. In order to ensure smooth on-site installation, the factory pays close attention to the details during the production to ensure the accuracy of the components, for the connection of complex steel structure and large-span roof structure, the important joints or components will be pre-assembled; for the production of difficult and complex components of the force to ensure the quality of the production of the project, to ensure smooth on-site installation.

Tongling Eastern City Activity Centre steel corridor of five floors, for the multi-storey truss structure, span of about 54m, lateral length of about 18m, rod for the H-type load face and box-type load face, total weight of about 1000t, lifting height of about 50m. corridor and the main tower structure using cast steel node connection, is the largest span of the air in the province of anhui steel corridors, the overall lifting difficulty. On-site installation by the project manager department of Honglu steel structure according to the site conditions to develop a safe and reliable construction programme, scientific management, careful organization and implementation of the "ground steel corridor overall assembly, computer control and synchronous lifting" method, to overcome the technical difficulties, the successful completion of the overall lifting of the steel corridor in the air.

Video

Product Advantages

  • * Honglu, a steel structure top manufacturer with daily capacity 15,000+Tons, Effectively Shorten Construction Period And Saving Construction Costs For You.
    * 10 Production Sites, 400+ Production Lines, Annual Production Capacity Of Steel Structure 5,000,000+ Tons, Slabs 30,000,000+m2.
    * Experiencing 21 Years, Serving 100,000+ Customers,Take The Lead In Passing ISO9001, ISO14001, OHSAS18001, Certification of European& American Standards.
    * Rich Product Chains, One-Stop Service For Steel Structure Projects

Product Application

Production Process

                                     Fabrication of Lifting Frame                          Assembly And Tack Welding Of Stiffened Plate

                                       Assembly Welding of Bracket                              Assembly Welding of Clapboard

With rich experience in bridge fabrication and installation, Honglu has carried out effective on-site control from the aspects of plate straightening, hole making, assembly and welding, etc...and the factory pre-assembly of bridge sections to ensure the high installation accuracy of steel members during construction.

 

Strictly On-site Construction Technology

Excellent engineering management teams, carry out on-site construction in strict accordance with the approved special construction scheme and operating procedures, ensure that all projects achieve the goal of high quality, high efficiency, low consumption, timely, safely and civilly.

 Our company, Honglu Steel Structure Group is one of largest steel structure manufacturers in China. We own experienced design engineers. advanced automatic welding machines. strict quality control system, best after service for steel structure.

Ne could design, fabricate, supply and construct all kinds of steel structure projects allover the world. Such as Light & Heavy Steel Workshop or Warehouse. Steel Space Frame, Steel Truss. Market building, Stadium. Shopping Mall, Roof & Wall Plates. etc

Packing &Delivery

 

Construction Process

FAQ

  • Q:

    Are you original manufacturer or trading company?

    A:

    We are original steel structure top manufacturer with daily capacity 15000 Tons. In order to know more of us professionalism and get the best competitive price, please contact the Sales Team to visit our factory.

  • Q:

    Is your price competitive compared with other companies?

    A:

    Our objectives are to give the best price with same quality and the best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.

  • Q:

    Can you send engineers or whole team to install my project?

    A:

    We will send detailed installation drawings for free. Or send engineers as installation director or a team upon request.

  • Q:

    Do you accept container loading inspection?

    A:

    Yes, you are welcome to send an inspector, not only for the container loading, but any time during the production time.

  • Q:

    What’s your work flow?

    A:

    Send us Steel Structure Drawing for quotation-Sign contract-Drawings Deepening and Task Decomposition-Production planning and task decomposition-Product outbound and shipping-Project sealing in archives

SEND US A MESSAGE

If you have any questions, please leave a message,we will reply as soon as possible.

Company Advantages

Honglu Group, mainly focuses on the manufacturing of high-quality steel structure and the R&D of prefabricated technology.

  • Steel structure manufacturer

    Honglu, a steel structure top manufacturer with daily capacity 15,000+Tons, Effectively Shorten Construction Period And Saving Construction Costs For You.

  • efficient production

    10 Production Sites, 400+ Production Lines, Annual Production Capacity Of Steel Structure 5,000,000+ Tons, Slabs 30,000,000㎡.

  • High quality service

    Experiencing 21 Years, Serving 100,000+ Customers,Take The Lead In Passing ISO9001, ISO14001, OHSAS18001,Certification of European& American Standards.

  • Rich product chain

    Rich Product Chains, One-Stop Service For Steel Structure Projects.

Certifications

  • ISO14001

  • ISO9001

  • OHSAS18001

  • Steel-Structure-Manufacturing-Certificate-(Special-Level)

  • National-Recognized-R&D-Center

  • National-Prefabricated-Construction-Base

On-line Factory Inspection

In order to arrange On-line Factory Inspection timely, please fill in the above information in detail, thank you.