• Nanjing Art Museum1
  • Steel Roof Trusses
  • Nanjing Art Museum

Nanjing Museum of Art Large Space Steel Truss Steel Truss Overall Design Three-dimensional Garden

Product Parameters

  • Project Name:

    Lanzhou Red House Times Square.

  • Design Style:

    The main body of the project is designed to consist of a podium and a super high-rise tower.

  • Installation:

    Installation Drawing or Technician On-site Guidance.

  • Certificate:

    ISO9001, ISO14001, OHSAS18001

  • Application:

    High-rise Building Steel Structure

  • Product Description
  • Video
  • Product Advantages
  • Product Application
  • Production Process
  • Packing &Delivery
  • Construction Process
  • FAQ
Inquiry

Product Description

Nanjing Art Museum

Project Overview

The design of the new Nanjing Art Museum is based on the creative axis of ‘Jinling in landscape, Jiangbei in writing’, and the whole building is in the shape of an irregular zigzag. The ‘three centres’ and auxiliary business buildings form the base, and the museum is suspended in the air, introducing natural landscape and cityscape, which not only makes use of the landscape, but also provides a transparent view. The design of the base is a mixture of water and greenery, with undulations, and has the charm of traditional gardens with stacked mountains and stones; the outline of the art museum, through the abstraction of form and geometric deformation, presents the posture of rigidity and flexibility, just like the clouds between the mountains and the water. The ultimate goal of the project is ‘a set of three-dimensional gardens with the spirit of the times in Nanjing, a cultural venue showing the vitality of the Jiangbei New District, and a living room for the public that can provide round-the-clock services’.

Structural design:

The superstructure of the new museum project of Nanjing Art Museum is almost supported by four giant columns (four cores), and the structural form of the cores is steel plate shear wall + concrete structure, with two underground floors and five above ground floors, with floor heights ranging from 6 to 6.6 metres, and with an area of about 200 square metres on each floor, containing lift shafts/staircases/ventilation wells/cable shafts, etc. The cross construction of the steel structure and civil engineering works in a narrow space, and the steel structure is erected first, followed by erection of steel reinforcement, supporting moulds, and concrete pouring, which is extremely difficult to carry out. One side of the wall was tilted at 81°, and the steel structure was built first, followed by the erection of external frames, reinforcement tying, mould supporting and concrete pouring, which made the construction extremely difficult.

Steel plate concrete shear wall thickness of 700mm, each layer of the top of a dark beam reinforcement row dense, ordinary concrete can not be poured, the project department after communication with the design institute to adjust the size of the concrete coarse aggregate and concrete ratio, just pouring method with five or six, the core cylinder template to take a number of measures to strengthen the special construction methods, in order to ensure that the steel shear wall of the normal construction of concrete.

Construction course:

On 18 January 2003, Nanjing Art Museum opened.

In December 2017, the construction of the new Nanjing Art Museum began.

On 1 April 2019, the new museum of art completed the foundation pit earth excavation.

On 1 September 2019, the basement structure was fully completed.

In November 2019, steel trusses were assembled.

On 22 December 2019, the steel trusses were lifted as a whole.

On 24 December 2019, the steel trusses were lifted into place and will be closed soon.

Video

Product Advantages

  • * Honglu, a steel structure top manufacturer with daily capacity 15,000+Tons, Effectively Shorten Construction Period And Saving Construction Costs For You.
    * 10 Production Sites, 400+ Production Lines, Annual Production Capacity Of Steel Structure 5,000,000+ Tons, Slabs 30,000,000+m2.
    * Experiencing 21 Years, Serving 100,000+ Customers,Take The Lead In Passing ISO9001, ISO14001, OHSAS18001, Certification of European& American Standards.
    * Rich Product Chains, One-Stop Service For Steel Structure Projects

Product Application

Production Process

                                     Fabrication of Lifting Frame                          Assembly And Tack Welding Of Stiffened Plate

                                       Assembly Welding of Bracket                              Assembly Welding of Clapboard

With rich experience in bridge fabrication and installation, Honglu has carried out effective on-site control from the aspects of plate straightening, hole making, assembly and welding, etc...and the factory pre-assembly of bridge sections to ensure the high installation accuracy of steel members during construction.

 

Strictly On-site Construction Technology

Excellent engineering management teams, carry out on-site construction in strict accordance with the approved special construction scheme and operating procedures, ensure that all projects achieve the goal of high quality, high efficiency, low consumption, timely, safely and civilly.

 Our company, Honglu Steel Structure Group is one of largest steel structure manufacturers in China. We own experienced design engineers. advanced automatic welding machines. strict quality control system, best after service for steel structure.

Ne could design, fabricate, supply and construct all kinds of steel structure projects allover the world. Such as Light & Heavy Steel Workshop or Warehouse. Steel Space Frame, Steel Truss. Market building, Stadium. Shopping Mall, Roof & Wall Plates. etc

Packing &Delivery

 

Construction Process

FAQ

  • Q:

    Are you original manufacturer or trading company?

    A:

    We are original steel structure top manufacturer with daily capacity 15000 Tons. In order to know more of us professionalism and get the best competitive price, please contact the Sales Team to visit our factory.

  • Q:

    Is your price competitive compared with other companies?

    A:

    Our objectives are to give the best price with same quality and the best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.

  • Q:

    Can you send engineers or whole team to install my project?

    A:

    We will send detailed installation drawings for free. Or send engineers as installation director or a team upon request.

  • Q:

    Do you accept container loading inspection?

    A:

    Yes, you are welcome to send an inspector, not only for the container loading, but any time during the production time.

  • Q:

    What’s your work flow?

    A:

    Send us Steel Structure Drawing for quotation-Sign contract-Drawings Deepening and Task Decomposition-Production planning and task decomposition-Product outbound and shipping-Project sealing in archives

SEND US A MESSAGE

If you have any questions, please leave a message,we will reply as soon as possible.

Company Advantages

Honglu Group, mainly focuses on the manufacturing of high-quality steel structure and the R&D of prefabricated technology.

  • Steel structure manufacturer

    Honglu, a steel structure top manufacturer with daily capacity 15,000+Tons, Effectively Shorten Construction Period And Saving Construction Costs For You.

  • efficient production

    10 Production Sites, 400+ Production Lines, Annual Production Capacity Of Steel Structure 5,000,000+ Tons, Slabs 30,000,000㎡.

  • High quality service

    Experiencing 21 Years, Serving 100,000+ Customers,Take The Lead In Passing ISO9001, ISO14001, OHSAS18001,Certification of European& American Standards.

  • Rich product chain

    Rich Product Chains, One-Stop Service For Steel Structure Projects.

Certifications

  • ISO14001

  • ISO9001

  • OHSAS18001

  • Steel-Structure-Manufacturing-Certificate-(Special-Level)

  • National-Recognized-R&D-Center

  • National-Prefabricated-Construction-Base

On-line Factory Inspection

In order to arrange On-line Factory Inspection timely, please fill in the above information in detail, thank you.